Over the years, the Senator representing Enugu West Senatorial District, Senator Ike Ekweremadu, has enjoyed great influence, crowned by unrestricted generosity that has made him one of the leading lights to look up to for a better Nigeria. In the Southeast, long maligned and boxed from having any huge say in Nigeria’s Presidency or being a huge part of plans to occupy it, he has become an enigma of sorts; not because of his longevity in the National Assembly or his charisma, but because of his capacity and his seamless fusing into the 21st century fabric of the Igbo nation and all that it holds dear.
For long, he has played the transformative light of social and political emancipation within and outside his constituency. Indeed, the circumstances surrounding the birth and naming of this enviable leader discredited any rebuttal claim against it being the birth of a new nation. He has touched his constituency positively. Senator Ekweremadu’s quality representation at the senate resonates with his people; he fulfills the aspirations and consciousness of his constituents. For the time he has spent in the Senate, he has taken his people from the labyrinth of neglect into the symmetrical terrain of infrastructural development.
Since his entrance into the house in 2003, he has been chairman of the board of trustees/founder of the Ikeoha Foundation, upon his entry into public service as chairman of Aninri LGA in 1997. The Foundation was incorporated in 2004 and has since given annual scholarships to hundreds of students from Enugu West Senatorial Zone, as well as micro-credit to farmer groups in the zone, not the kind of vote buying micro-credit that was recently launched by the APC led government in Osun State. Ikeoha foundation also organises other projects like vocational and adult education, quiz and sports competitions.
Ekweremadu’s youth and women empowerment programmes are legendary. He attracted the establishment of five youth development centres, one in each of the five local government areas that comprise his Enugu West constituency. He has remained a rallying point for many politicians in his state, particularly in Enugu West.
With the collaboration of the state government, the senator, who is currently the deputy Senate President, has put his shoulders to the oars and is doing everything in his power to change the face of his constituency with various infrastructural projects, ranging from dualisation of existing roads to construction of new ones and provision of potable water.
Since his first sojourn in the house, Ekweremadu has sponsored his fair share of bills – to put it nobly. Some of them include the; Civil Process Servers Bill, February 2010; Private Detectives and Investigators Bill, April 2010; State of the Nation Address Bill, February 2008; River Basins’ Amendment Bill, 2008; Federal Land Registry (General Provisions) Bill, February 2008, amongst others.
Also, Ekweremadu co-sponsored a number of bills, as well, among which are the Nigeria Police Act (Repeal and Re-enactment) Bill, April 2008; Abolition of Discrimination Against Women Bill, February 2008; National Human Rights Commission Act (Amendment) Bill, February 2008; Legal Aide Act (Amendment) Bill, February 2008; Elimination of Violence in Society Bill, November 2008; Legal Practitioners Act (Amendment) Bill, March 2008; Criminal Justice (Victims’ Remedies) Bill, March 2008 etc.
The erudite lawyer has some motions to his name, as well. Some of them include; Absence of the President, Federal Republic of Nigeria (Senate Resolution in March 2010) which triggered a chain of legislative interventions that saw to the emergence of an Acting President; the Passing Away of President Umaru Musa Yar’Adua, March 2010; the Surging Incidence of Kidnapping and Hostage-taking in Nigeria, July 2009; Outbreak of Hostilities in Jos; Menace of Gully Erosion and Landslide in the South East, 2007 etc.
Some of the motions he has co-sponsored motions include the Abandonment of Nigerian Ship Crew in Captivity in Somalia, Deplorable State of Nigerian Roads etc.
Recently, Ekweremadu moved to sponsor the state police bill that would decentralise the nation’s policing system. Ekweremadu, who slammed the current system as “dysfunctional and unsuitable for a federal system, due to the rising insecurity and killings in Nigeria,” said that the killings had continued mainly because the federating states were not constitutionally allowed to recruit, train, and equip enough manpower for the security of lives and property of citizens in their states. The bill will also address the fears of Nigerians opposed to state police. Just like the Judiciary, the bill will provide for a central police service commission and, also, structure the state police services in ways that [make them] from abuse by any governor or state. It is also a bill we can conclude in record time. Thus, Ekeremadu has performed many oversight functions creditably, applying a combination of extant and common laws, rule books, constitution and judiciary pronouncements as a guiding principle on his legislative phenomena duties.
Indeed, Ekweremadu can be considered an enigma; undefeated, unfettered and courageous in fighting a course he believes right for the masses, despite attempts to intimidate and cower him into a course not in tandem with his. Many a-time, he has stood his ground to fight for justice, equity and rule of law.
Ekweremadu is an embodiment of leadership, political eminence; humbleness and willing service.
It is not in doubt that his achievements, commitment and loyalty to the party would boost the PDP’s chances and help it generate more votes in the state come 2019.
“Prior to his election, the lawmaker and former Chief of Staff to the Enugu State government felt the pulse of his people his declaration and in 2003, before the polls, he said: ” The reality of the situation of our time, the compelling need for quality representation and the urge to bring about the entire dimensions of our geo-political areas to the front burner of Nigeria national life has induced in some of us the actions resulting in the drive to partake of the exercises in one of the higher echelons of political leadership in the country, today.
“To that effect, I had considered valid factors and concluded that the urge for me to be a part of it all, principally for the purpose of genuine representation, equaled the zeal in the community of our people who have already decided to stake in everything to have their interests duly represented. Indeed, quality representation is all there is in democracy and it is within the province of due political aspiration that our people intend to send in the first eleven for the decisive years inclusive in the second segment of this democratic practice.
“I have for sometime considered what my people demanded as typifying quality representation and so came to the conclusion that what they seek, what they intend to represent and what they urge should be their lot, is to send in the best based on the appreciation of the terrain and the people. A deep interest in the upliftment of the people and a commitment to the efforts desired for the actualisation of the dreams of our people.
“[My mission is] to restore people’s faith in the concept of representative democracy as symbolized by the legislature, and more particularly within the context of federal representation whereby the federal legislator must only be seen as a real mouthpiece and knight for his people – initiating/influencing favourable legislation and mobilizing development resources – and not a distant sojourner in the seat of government, far removed from the realities, the needs and the aspirations of his people,” he assured.
Fifteen years since these proclamations, Ekweremadu has kept his word to the letter, projecting, protecting and representing his constituency in deed and word; collaborating and consulting all segments of his support base, strategically engaging relevant stakeholders, creating partnerships that continued on self-propulsion to bring projects and programmes to his constituency. This innovative leadership style has resulted in substantial development in his constituency.
Below is a summary of these projects:
ANINRI LGA
- ELECTRICITY PROJECTS & DONATION OF TRANSFORMERS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Solar Powered Street Lights in various Communities. | All Communities in Aninri LGA | 2010 | 2012 | Completed. |
2 | Construction of 132 D Line
2X60 MVA 132 Substations. |
Mpu | 2010 | Ongoing. | |
3 | Feasibility and New Transmission, 132 Line Project. | Ugwuaji-Nenwe | 2010 | 2012 | Ongoing. |
4 | Power Improvement.
Further Rural Electrification and Donation of Computers. |
Aninri | 2010 | Completed. | |
5 | Rehabilitation/Installation of Street Lights, 100KVA Transformer, 65KVA Sound Proof Generating Set and Accessories. | Mpu | 2017 | To be awarded. |
- ROAD & EROSION CONTROL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Erosion Control Project. | Ihuibe-Ihuezoke Okpanku. Onumision-Onu Akparata – Affia Ogwo-Ihuezoke | 2011 | Ongoing:
Earthworks and Side Drains 80% Completed. Asphalt 50% completed. |
|
2 | Completion of Erosion Control Project. | Amaogudu-Amagu-Amaeze Okpanku.
Old Afor Market- Egunkwo |
2012 | Ongoing:
Earthworks and culverts completed. Side Drains and Asphalt 50% completed. |
|
3 | Erosion control project. | Imuno — Mpu | 2014 | Ongoing: Earthworks Completed. Asphalt ongoing. |
|
4 | Erosion Control Project. | Onu Agbana-Obunagu Amagu Mpu | 2014 | Ongoing: Earthworks completed. Asphalt 50% completed. |
|
5 | Erosion Control Project. | Obeagu- Ezza-Azunkwo- Ndeaboh | 2015 | Earthworks and Side Drains Completed. Asphalt ongoing. |
|
6 | Erosion Control Project. | Ugwuakanu-Onovo- Iyapo-Amabiribo Okpanku | 2015 | 2017 | Completed. |
7 | Erosion Control Project. | Amachara Mpu (Ihuejiro-Aguenyi) | 2016 | Earthworks 80% Completed. Asphalt and Side Drain to be awarded. |
|
8 | Erosion Control Project. | Ovum — Obuagu, Mpu | 2015 | Earthworks Completed. Asphalt Completed. |
|
9 | Rehabilitation of Access Road to Ogbombara spring water Project, Amaeguelu Amumkpa Agboechara. |
Ogbombara | 2016 | 2017 | Completed. |
10 | Erosion Control Project. | Anekeorji – Amagu Road (Offia Aguenyi- Amankanu Oduma) | 2016 | Ongoing: Earthworks 75% completed. Culverts completed.Side Drains and Asphalt to be awarded. |
|
11 | Construction of Double Cell Culvert, Earthworks.
Erosion Control Project. |
Imuno-Mpu | 2017 | To be awarded. | |
12 | Amagu-Uhuezeoke
Erosion Control/Link Barley Bridge Relocation. |
Ekoli/Okpanku | 2017 | Taken over by Enugu State | |
13 | Onuakanu-Utin Farm Erosion Control. | Amabiriba Okpanku | 2017 | To be awarded. | |
14 | Neochele-Railway Station
Erosion Control Road. |
Ndeaboh | 2017 | To be awarded. | |
15 | Road Project. | Emudo-Amorjj Nenwe | 2017 | To be awarded. |
- WATER PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Ivo Dam Project, Irrigation, Water Supply,
Channelization, Access Road & Hydropower. |
Ivo River Okpanku/Mpu | 2009 | Ongoing. | |
2 | Zain Water Project. | Ndeaboh, Mpu, Nenwe | 2010 | 2012 | Completed. |
3 | Exit Water Schemes | Mpu, Ndeaboh, Nenwe, Oduma | 2010 | 2012 | Completed. |
4 | Reticulation of Ogbombara Spring Water Harvestation Project. | Ndeaboh | 2014 | 2015 | Completed. |
- SCHOOL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Classroom Blocks, Classroom Furniture and VIP Toilets in Community Secondary School. |
Agugwu Ohafia | 2012 | 2013 | Completed. |
2 | Construction of Computer Centres, Supply of Computers, Furnitures and other accessories to the centres. | Community Secondary School, Ekoli Okpanku. | 2011 | 2013 | Completed. |
3 | Construction of Computer Centres, Supply of Computers, Furnitures and other accessories to the centres. | Community Secondary School, Mpu | 2011 | 2013 | Completed. |
4 | Construction of Computer Centres, Supply of Computers, Furnitures and other accessories to the centres. | Community Secondary School, Obeagu, Oduma | 2011 | 2013 | Completed. |
5 | Construction of Computer Centres, Supply of Computers, Furnitures and other accessories to the centres. | Community Secondary School, Ndeabor | 2011 | 2013 | Completed. |
6 | Construction of Computer Centres, Supply of Computers, Furnitures and other accessories to the centres. | Central School Ndeaboh | 2011 | 2013 | Completed. |
7 | Construction of Library Centres, Library Furniture and Supply of Library Books | Community Secondary School, Umunevo, Emudo Nenwe | 2011 | 2013 | Completed. |
8 | Supply of Books and Instructional Materials. | Town School, Mpu | 2011 | 2012 | Completed. |
- COMMUNITY & TOWN HALL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Provision of Field Office and Utility Van | Ndeaboh | 2010 2010 | Completed. | |
2 | National Youth Development Centre. | Mpu | 2011 | 2016 | Completed. |
3 | Procurement of Artecxin | Aninri | 2014 | 2015 | Completed. |
4 | Supply of Basic Drugs. | Okpanku Health Centre | 2014 | 2014 | Completed. |
5 | Construction of community multipurpose mobilization/ empowerment/leadership. | Mpu | 2016 | Ongoing | |
6 | Construction of Town Hall and Extension for Women Empowerment/ Training. | Ekoli | 2017 | To be awarded. | |
7 | Construction of two blocks for Development Centre. | Mpu | 2017 | To be awarded. | |
8 | Reconstruction/Maintenance of Youth Development
Centre. |
Mpu | 2017 | To be awarded. |
- SKILL ACQUISITION PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Training Women Farmers
on Application of Herbicide |
2014 | 2014 | Completed. | |
2 | Youth/Women Empowerment, Skill
Acquisition and Provision of Model Tools for Fishing/Agriculture. |
Mpu & Ekoli/Okpanku | 2017 | To be awarded. |
- RECREATION PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Survey & Design of a Mini Sports Stadium. | Ndeaboh | 2017 | To be awarded. |
AWGU LGA
- ELECTRICITY PROJECTS & DONATION OF TRANSFORMERS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Provision of 33/0.415 KV Distribution Transformers. | Owelli, Ugbo and Okpanku | 2010 | 2012 | Completed. |
2 | Construction of Solar Panels and Street Light. | Awgu Communities | 2010 | 2012 | Completed. |
3 | Procurement of 500KVA, 200KVA
Transformer and Feeder Pillars for Power Improvement |
Awgu | 2015 | 2016 | Completed. |
4 | Rural Electricity Project. | Awgunta | 2016 | Ongoing |
- ROAD & EROSION CONTROL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Road Project Section I
Section II |
Achi-Mmaku-Agwu- Ndeabor-Mpu-kpanku-Akaeze. | Completed. | ||
2 | Erosion control Project. | Rosary High School, Awgu | 2010 | 2011 | Completed |
3 | Erosion control Project. | Isu-Awa-Agbudu-Ihe | 2010 | Ongoing:
Earthworks completed. |
|
4 | Erosion control Project. | Mmaku-Mgbidi Nkwe-Ezere Road. | 2010 | Ongoing: Taken over by Ugwueme-Awgunta-Obeagu Road. |
|
5 | Erosion Control Project. | Okpumodu-Enugu Mmaku-Isi-Mmama | 2014 | Ongoing:
Earthworks completed. |
|
6 | Completion of Erosion Control Project. connecting Communities in Awgu/Orji River | Egwu-Achi-Agwunta | 2014 | Ongoing:
Earthworks and Side Drains completed.
Asphalt 50% completed. |
|
7 | Erosion Control Project. | Ugwueme | 2014 | Ongoing:
Earthworks and Side Drains completed. |
|
8 | Erosion Control Project. | Amoli | 2014 | 2016 | Completed |
9 | Erosion Control Project.
Agwu LGA |
Ololi | 2014 | 2017 | Completed |
10 | Completion of Erosion Control Project. | Eziama Afam-Ajaba-Agunese | 2014 | Ongoing:
Earthworks and Side Drains completed.
Asphalt 50% completed. |
|
11 | Completion of Erosion Control Project. | Agwu LGA Enugu | 2014 | Ongoing | |
12 | Road Project | Umuowo Junction-Amata Ituku | 2015 | Ongoing:
Earthworks and Side Drains completed.
Asphalt ongoing. |
|
13 | Erosion Control Project. | Mgbowo | 2017 | To be awarded. | |
14 | Erosion Control Project. | Obuofia Ololi | 2017 | To be awarded. | |
15 | Erosion Control Project. | Ogbuma Awgu | 2017 | To be awarded. |
- WATER PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Zain Water Project. | Amoli, Agwu | 2010 | 2012 | Completed. |
2 | Exit Water Schemes | Agwu, Ogugu, Mpu (Extension), Ugbo Extension), Ndeaboh, Nenwe, Oduma, Ihe, Aku, Obeagu, Udi, Ezeagu, Agbada Aninri, Nkwere, Ugwueme, Amoli, Isu Awaa. | 2010 | 2013 | Completed. |
3 | Construction of Earth Dam Project. | Ugbo | Ongoing. |
- SCHOOL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Computer Centres, Supply of Computers, Furniture and other Accessories. |
Urban Secondary School, Agwu. Community Secondary School, Ugbo. Community Secondary School, Ezinese, |
2011 | 2013 | Completed. |
2 | Construction of library Centres, Library Furnitures & Supply of library Books | Mgbidi. Boys Secondary School, Mgbowo. St. Vincent Secondary School Agbogugu. | Completed. | ||
3 | Supply of Books and Instructional Materials | Boys Secondary 5chool, Mgbowo | 2011 | 2011 | Completed. |
- COMMUNITY & TOWN HALL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Provision of Field Office and Utility Van | Owelli/Ugbo Junction | 2010 | 2010 | Completed. |
2 | National Youth Development Centre. | Awgu | 2012 | 80% Completed. | |
3 | Procurement of Artecxin Child Powder Oral Suspension | Awgu | 2014 | 2015 | Completed. |
4 | Supply of Basic Drugs | Mmaku Health Centre, Ajabo | 2015 | 2015 | Completed. |
- SKILL ACQUISITION PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Training Women Farmers on Application of Herbicide | 2014 | 2014 | Completed. |
EZEAGU LGA
- ELECTRICITY PROJECTS & DONATION OF TRANSFORMERS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Solar Panels and Street Light. | Ezeagu LGA
Communities |
2010 | 2013 | Completed. |
2 | Procurement of 500KVA, 200KVA Transformer and
Feeder Pillars for Power Improvement |
Ezeagu | 2015 | 2017 | Donated to needy
communities. Ogwu, Offia, Owa |
- ROAD & EROSION CONTROL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Completion of Erosion Control Project. | Nkwo-Agana Amandim- Amagu | 2014 | Ongoing:
Earthworks and Side Drains completed. Asphalt 70% completed. |
|
2 | Erosion Control Project. | Amansiodo-Imezi-Oghe | 2015 | Ongoing:
Earthworks and Side Drains completed. Asphalt 70% completed. |
|
3 | Completion of Erosion Control Project. | Awha-Oyofo-Imane, wollo | 2015 | Ongoing: Earthworks and Side Drains Completed. Asphalt 70% ongoing. |
|
4 | Completion of Erosion Control Project. | Okpueze Umumba Ndiuno | 2015 | Ongoing: Earthworks and Side Drains Completed. Asphalt 70% ongoing. |
|
5 | Completion of Erosion Control Project. | Aweneolo-Mgbagbuowa | 2015 | Ongoing: Earthworks and Side Drains Completed. Asphalt 70% ongoing. |
|
6 | Erosion Control Project. | Obinagu Imama Akamaoghe. | 2017 | To be awarded | |
7 | Erosion Control Project. | Amadim-Ibite | 2010 | Ongoing: Earthworks and Side Drains completed. |
|
8 | Construction of Road Project. | Imezi Owa-Eke Arim- Aguobu Owa | 2010 | Ongoing: Earthworks and Side Drains completed. |
|
9 | Erosion Control Project. | Oye Owa-Ekeazu Obeleagu-Obiana | 2010 g | Ongoing: Earthworks and Side Drains completed. |
- WATER PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Provision of Overhead Tank, Gen Set/House and Connection to Electricity. Borehole Water Project. | Obinagu-Imama- Akama Oghe | 2014 | 2017 | Completed. |
- SCHOOL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Classroom Blocks, Classroom Furniture and VIP Toilets. | Aguobu Owa High School. Community Secondary School, Ndiagu. |
2012 | 2014 | Completed. |
2 | Construction of Computer Centres, Supply of Computer Furniture and other Accessories | Community Secondary School Obelagu-Umana | 2012 | 2014 | Completed |
- COMMUNITY & TOWN HALL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | National Youth Development Centre. | Iwollo | 2013 | Ongoing: Fencing completed.Community stopped further work. |
|
2 | Procurement of Artecxin Child Powder Oral Suspension |
Ezeagu | 2014 | 2015 | Completed. |
- SKILL ACQUISITION PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Training Women Farmers on Application of Herbicide | 2014 | 2015 | Completed. |
OJI RIVER LGA
- ELECTRICITY PROJECTS & DONATION OF TRANSFORMERS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Solar Panels and Street Light. | Oji River LGA Communities | 2010 | 2014 | Completed. |
- ROAD & EROSION CONTROL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEARS | REMARKS | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Road Section I Project | Oji-Achi-Mmaku-Agwu- Ndeabor-Mpu-Okpanku-Akaeze | Ongoing:
Efforts being made to solve contractors problems. |
||
2 | Erosion control Project. | Amoli Junction- Eyimba-Achi | 2010 | Ongoing:
Earthworks completed. |
|
3 | Erosion control Project. | Akpugoeze-Osibe | 2010 | 2013 | Stages Completed |
4 | Erosion control Project. | Ezi-Udogo-Obodo Akwu | 2014 | Earthworks and Drainage Design completed.
Asphalt ongoing. |
|
5 | Erosion control Project. | Ekegbo-Ozuda-Umuegbosi | 2014 | Earthworks and Drainage Design completed.
Asphalt ongoing. |
|
6 | Completion of Erosion Control Project. | Ukpa Ujiri-Ndibeoji- Lakwa | 2014 | Ongoing: Earthworks and Side Drains completed. Asphalt 30%. |
|
7 | Completion of Erosion Control Project | Obinaugwu-Gragu Ahani Achi | 2014 | 2015 | Earthworks and Side Drains completed. |
8 | Erosion Control Project | Umuama-Umuegbosi | 2014 | Earthworks and Side Drains completed. | |
9 | Erosion Control Project. | Isikwe Girls Secondary School Road | 2014 | 2016 | Earthworks and Side Drains completed. Asphalt completed. |
10 | Erosion Control Project. | Umuabali- Umuchime-Ogbdiukwu |
2014 | Ongoing: Earthworks and Side Drains completed. |
|
11 | Erosion Control Project. | Amankwo Inyi Road- Inyi Girls Secondary School |
2014 | Ongoing: Earthworks and Side Drains completed. |
|
Erosion Control Project. | Ihe-Agbudu | 2014 | Ongoing: Earthworks and Side Drains completed. |
||
13 | Erosion Control Project. | Ihe-Obuona-Ujiri . |
2014 | Ongoing: Earthworks and Side Drains completed. |
|
14 | Erosion Control Project. | Umuome Okwe- Umuegbosi Uno | 2014 | Ongoing: Earthworks and Side Drains completed. |
|
15 | Erosion Control Project. | Egwu-Achi-Agwunta | 2014 | Earthworks and Side Drains completed. Asphalt works ongoing. |
|
16 | Road Design Project | Ugwuoba-Akpugoeze- Inyi | 2015 | Ongoing: Earthworks and started. |
|
17 | Erosion Control Project. | Ezichieze – Iheachi – Ekwelle Enugu Agu Achi | 2016 | Ongoing: Earthworks and Side Drains completed. Asphalt 80%. |
|
18 | Erosion Control Project. | Ujiri MKT Square — Mbogu -Ndibe Ekwelle Achi |
2016 | Ongoing: Earthworks and Side Drains under construction. J |
|
19 | Completion of Erosion Control Project. | Amaekwuru-Isikwe | 2016 | Ongoing: Earthworks and Side Drains completed. Asphalt 65%. |
|
20 | Erosion Control Works. Access Road. | Federal Cooperative College. | 2017 | To be awarded. | |
21 | Erosion Control Project. | Efulu Ugwuoba | 2017 | To be awarded. | |
22 | Erosion Control Project. | Umuchime Enugu Inyi | 2017 | To be awarded. | |
23 | Erosion Control Project. | Ehuhe Achi Court- Umabi | 2017 | To be awarded. |
- WATER PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Water Project and Installation of 300KVA and Electrification | Ahani | 2014 | 2016 | Completed. |
2 | Water Project. | Umulakwa-Achi | 2015 | 2016 | Completed. |
3 | Oji River Greater Water Supply Scheme | Oji River | 2015 | Ongoing | |
4 | Amaekwuru Water Project. | Amaekwuru | 2015 | 2016 | Completed. |
5 | Completion of Akwunubi/ Akwu Achi water project. | Agu Achi | 2016 | 2017 | Completed. |
6 | Oji River Regional Water Supply Borehole Project and Youth Development Centre | Isiokwe Amankpunato
Achi; Enugu Inyi; Abo Umuori Umumba Achi |
2016 | Ongoing |
- SCHOOL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Computer Centres, Supply of Computers, Furniture and Accessories to the Centres | Girls High School Inyi. Urban Secondary School, Oji River | 2012 | 2014 | Completed. |
2 | Construction of Library Centres, Library Furniture and supply of Library Books. | Boys High School, Inyi | 2012 | 2014 | Completed. |
- COMMUNITY & TOWN HALL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | National Youth Development Centre. | Achi | 2011 | 2015 | Completed. |
2 | Procurement & Supply of Hospital Equipment, Furniture and Drugs | Umuori Health Centre | 2014 | 2015 | Completed. |
3 | Procurement of Artecxin Child Powder Oral Suspension | Oji River | 2014 | 2015 | Completed. |
4 | Supply of Basic Drugs | Community Centre, Akpugoeze | 2015 | 2015 | Completed. |
5 | Maintenance of Youth Development Centre. | Achi | 2017 | Ongoing: For security and compound clearing. |
- SKILL ACQUISITION PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Training Women Farmers on Application of Herbicide | Oji River | 2014 | 2015 | Completed. |
UDI LGA
- ELECTRICITY PROJECTS & DONATION OF TRANSFORMERS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Procurement of 500KVA, 200KVA Transformer and
Feeder Pillars for Power Improvement |
Oji/Udi | 2013 | 2015 | Completed. |
- ROAD & EROSION CONTROL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Erosion Control Project. | Amokwe | 2010 | 2013 | Ongoing: Earthworks completed. |
2 | Erosion Control Project. | Umuavulu-Abo | 2010 | 2013 | Ongoing: Earthworks completed. |
3 | Erosion Control Project. | Enugwu Obianogu | 2010 | 2013 | Ongoing: Earthworks completed. |
4 | Erosion Control Project. | Okafia-Adami-Enugu Ezechi Ukana |
2014 | Ongoing: Earthworks and Side Drains completed. Asphalt ongoing. |
|
5 | Construction of Erosion Project | Obinagu-Umuabi | 2014 | Ongoing: Earthworks and Side Drains completed. Asphalt ongoing. |
|
6 | Erosion Control Project. | Aguma-Enuabor-Umuozo Abor |
2015 | Ongoing: Earthworks and Side Drains completed. Asphalt ongoing. |
|
7 | Road Project | Umulumgbe-Umuoka- Amokwu-Affal kedimkpa-Amozalla- Egede-Uwhum | 2017 | To be awarded. | |
8 | Erosion Control Project. | Umuovu-Anekeze- Umuanum-Okwum Egede |
2015 | Earthworks completed. | |
9 | Construction of Road Project | Cathedral Road, Nkwoagu Market-FRSC Academy Road |
2016 | Earthworks and Side Drains 90% completed. | |
10 | Construction of Road Erosion Control Project. | Eziama Okpatu | 2016 | Earthworks and Side Drains 70% | |
11 | Completion of
Erosion Control Project. |
Community High School Junction-Iyi Ogor, Affa | 2016 | Ongoing: Earthworks and Side Drains completed. |
|
12 | Erosion Control Project. | Project. Eziama Edem- Umulumgbe | 2017 | To be awarded. |
- WATER PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Completion of water project. | Amani — Ibite Okpatu | 2014 | 2016 | Completed. |
2 | Water Project. | Umuaga Town | 2014 | 2016 | Completed. |
3 | Water Project with Reticulation. | Akunino | 2014 | 2016 | Completed. |
4 | Completion of Umuabi Exit Water Scheme Phase II. | Ugwuagu Amadi | 2015 | 2016 | Completed. |
5 | Completion of Water Scheme. | Egede | .2015 | 2017 | Completed. |
- SCHOOL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Construction of Classroom Blocks, Classroom Furniture and VIP Toilets | Community High School, Amokwe | 2013 | 2015 | Completed. |
2 | Construction of Library Centres, Library Furniture and Supply of Library Books | Community Primary School, Ukana | 2013 | 2015 | Completed. |
- COMMUNITY & TOWN HALL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | National Youth Development Centre. | Ngwo | 2012 | 90% Completed.
Repair of burnt buildings to be awarded. |
|
2 | Procurement of Artecxin Child Powder Oral
Suspension |
Oh River | 2014 | 2014 | Completed. |
3 | Supply of Basic Drugs to Community Health Centres. | Ebe, Udi Health Centre | 2015 | 2015 | Completed. |
4 | Maintenance of Youth Development Centre. | Ngwo | 2017 | To be awarded. | |
5 | Rehabilitation / Reconstruction of burnt buildings in Youth development center. |
Ngwo | 2017 | To be awarded. | |
6 | Completion of Multipurpose Hall and
other repair of Damaged Buildings. |
Ngwo | 2017 | To be awarded. | |
7 | Completion of Town Hall. | Nsude. | 2017 | Construction
materials to be supplied by SDG. |
- SKILL ACQUISITION PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Training Women Farmers
on Application of Herbicide |
2014 | 2015 | To be awarded. |
OUTSIDE ENUGU WEST
- ELECTRICITY PROJECTS & DONATION OF TRANSFORMERS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Completion of Rural Electricity Project | Ogollu-Ogbango Enetue in Adoka District Otukpo LGA, Benue State |
2015 | Ongoing. |
- ROAD & EROSION CONTROL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Road Rehabilitation Project | Obiozara-Uburu- Ishiagu | 2007 | 2015 | Completed. |
2 | Rehabilitation of Road Project. | Enugu-Onitsha Expressway | 2009 | Ongoing. | |
3 | Rehabilitation of Road Project. | Enugu-Port Harcourt Expressway | 2009 | Ongoing. | |
4 | Construction of Road Project. | Obollo Afor-Ehamufu- Nkalagu | 2009 | Ongoing. | |
5 | Erosion Control Project | Amabokwu Aku, Ogbede, Igbo Etiti LGA, Enugu State | 2014 | 2015 | Completed. |
6 | Roads, Drains, Culverts under Section I Site and Services. | Republic Layout, Enugu | 2014 | 2016 | Completed. |
7 | Erosion Control Project. | Ikwoka-Amagu Ajuno Obimo, Nsukka LGA, Enugu | 2014 | Ongoing: Earthworks, Side Drains completed. Asphalt 60%. |
|
8 | Erosion Control Project. | Ifuruaku/Hospital Road, Abia State | 2014 | 2016 | Completed. |
9 | Erosion Control Project | Nkwo Mili-Lyiukwu | 2014 | 2016 | Completed. |
10 | Erosion Control Project | Umuibeji, Umuahia, Abia State | 2014 | 2016 | Completed. |
11 | Erosion Control Project | Ogbondiku-Amaekpe, Umuahia South, Abia State | 2014 | 2016 | Completed. |
12 | Erosion Control Project. | Nomeh-Nenwe, Nkanu East LGA, Enugu | 2014 | Ongoing. | |
13 | Erosion Control Project. | Adoration-Umuchigbo, Enugu East LGA, Enugu | 2015 | Ongoing | |
14 | Road Project. | Nnewe-Oduma-Uburu | 2015 | Ongoing. | |
15 | Erosion Control Project. | One Igboeze Uzoanyi Ovoko Agu Igboeze South LGA, Enugu |
2015 | . Ongoing. |
|
16 | Completion of Erosion Control Works. | Umuhu-Oboama-Umueze — Eziakalakaohu, Aboh Mbaise, Imo | 2015 | 2017 | Completed |
17 | Erosion Control Project. | Ihenyl -Ehamufu Old Post Office Road, Isiuzo LGA, Enugu. | 2016 | Ongoing. | |
18 | Rehabilitation of Road Project. | Chiedozie Ogbonna Street – Police College Agbani Road, Enugu South LGA, Enugu |
2016 | Ongoing. | |
19 | Construction of Access Road with drainage Project.. Afikpo North LGA | Echara Mgbom-Iyioka Junction, Afikpo North LGA, Ebonyi |
2016 | Ongoing. | |
20 | Construction of Road Project. | of Oye Ukpo-Ezicheke Sub Ezekwesili Penticos Church Road/Esedo Road, Dunukofia LGA, Anambra |
2016 | 2017 | Earthworks completed. |
21 | Erosion Control Project. | lrukalita/Ngwulu-Agu Village, Enugu Agidi, Njikoka LGA, Anambra State | 2017 | To be awarded. | |
22 | Erosion Control Works (Construction of Drainage). |
Okpudho-lkata Road, Edeoha; and Ayagoko-Ula-Ukpata Road, Ahosa, Ahoada East LGA, Rivers State. |
2017 | To be awarded. | |
23 | Erosion Control Project. | Ogbeke Nike, Enugu East LGA, Enugu | 2017 | To be awarded. | |
24 | Road Project. | Ndiagu-Ezima Akiliyi- Nkalagu, Isielu LGA, Ebonyi State | 2017 | To be awarded. | |
25 | Water Project. | Umuikedilo Eziama Ibiasoegbe, Oru-West LGA, Imo State | 2017 | To be awarded. | |
26 | Stream-Tyer Road Erosion Control Project. | Emene | 2017 | To Mandate. To be awarded. |
- WATER PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Purchase of Water tanker for Water Supply | Enugu Airport | 2007 | 2007 | Completed. |
2 | Irrigation Project. | Amagunze | 2010 | 2011 | Completed. |
3 | Water Project and 3KM Reticulation. | Ibagwa Ani Town, Nsukka LGA, Enugu State. | 2014 | 2015 | Completed. |
4 | Water Project. | Bishop Shanaham, Nsukka LGA, Enugu State | 2014 | 2015 | Completed. |
5 | Motorized Borehole Water Project. | Nkwo Nnewi Market, Anambra State | 2014 | 2015 | Completed. |
6 | Solar Power Borehole Water Project and Reticulation. |
Ozizza Village, Afikpo North LGA, Ebonyi State. | 2014 | 2015 | Completed. |
7 | Rehabilitation of Egberu Mputu Water Scheme. | Isiala Ngwa South LGA, Abia State. | 2014 | 2015 | Completed. |
8 | Completion of Water Supply Project. | Oshigo —Aku, Igbo -Etiti LGA, Enugu | 2015 | 2017 | Completed. |
9 | Provision of mo Borehole, Overhead tank, Gen set & house, service point etc. | Ugwualla — Osuachara, Isiala Mbano LGA, Imo | 2016 | 2017 | Completed. |
10 | Completion of Ife Water Scheme. | Umuoruo Ife, Ezinihite Mbaise LGA, Imo. | 2016 | 2017 | Completed. |
11 | Provision of Motorized Borehole. | Amalla-Obollo and Umuonehe-Aji Communities, Igboeze North LGA, Enugu | 2017 | To be awarded. | |
12 | Water Supply Borehole Project. | Inikiri Effium, Ohaukwu LGA, Ebonyi State | 2017 | To be awarded. | |
13 | Rehabilitation of Borehole & Conversion to Solar. | Okpala, Ngor-Okpalla LGA, mo State | 2017 | To be awarded. | |
14 | Provision of 1 No. Motorized Borehole. | Okwoko Village, Nkporo Ohafia LGA | 2017 | To be awarded. | |
- SCHOOL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Dental College: Construction of Rectors Residence, Additional
Classrooms/Sick Bay and Admin Block |
Enugu East | 2010 | 2012 | Completed. |
2 | Construction of 1 No. 2 bed room flat and 3 Nos 1 bed room flat terrace
building Teachers’ Quarters, Ughelli South LGA, Delta State |
Omosuomo Inland Community, Ughelli
South LGA, Delta State |
2017 | To be awarded. |
- COMMUNITY & TOWN HALL PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Airport Runway Extension/Fxpressway, Air Conditioning, Installation of Conveyor Belt and
Purchase of Water tanker. |
Akanu Ibiam International Airport | 2009 | 90% completed. | |
2 | Rice Project | Ada | 2010 | Ongoing. | |
3 | Rehabilitation of AFL CAT | Enugu East | 2010 | 2012 | Completed. |
4 | Construction of Science Laboratory/Engineering
Workshop. |
Centre for Basic Space Science, Nsukka, Enugu | 2014 | Ongoing. | |
5 | Procurement of 8 Nos. Project Vehicles for the
Institute. |
Centre for Basic Space Science, Nsukka, Enugu | 2014 | Ongoing. |
- SKILL ACQUISITION PROJECTS
S/N | PROJECT | LOCATION | PROJECT YEAR | REMARK | |
YEAR
STARTED |
YEAR
COMPLETED |
||||
1 | Training of Engineers from Enugu West Senatorial District | Centre for Basic Space Science, Nsukka, Enugu | 2014 | 2016 | Completed |
TRANSFORMERS DONATED TO THE FOLLOWING COMMUNITIES IN 2016/2017
- Amankanu Ohafia Oduma 3 No 200KVA.
- Ogbaku Community 1 No 300KVA/Feeder Pillar.
- Ndi – Agbana Umunnagwu Amechi Uwani Community 1 No 300KVA/ Feeder Pillar.
- Umuchigbo Nike Community. 1 No 200 KVA Transformer.
- Enugu Agidi Community 1 No 200 KVA & 1 No 3 KVA Transformer.
- Enugu Owelli Community 1 No 300 KVA Transformer.
- IshiaguUmuinbaCommunitylNo300KVA Transformer.
- Egede Ogwofia Owa Community. 1 No 300 KVA Transformer.
- Umuavu Umuabi Community. 1 No 300 KVA Transformer.
- Umulumgbe Community. 1 No 500 KVA Transformer.
- Umuoshie Oboama Enyiogugu Aboh Mbaise LGA Imo State. 1 No 300 KVA Transformer and Feeder Pillar.
- Umuduru Eziimba – Ogberuru Orlu LGA Imo State. 1 No KVA Transformer.
OTHER PROJECTS EXECUTED / FACILITATED BY THE DEPUTY SENATE PRESIDENT
- Completion of St. Peters Church Outstation Ituku Awgu LGA.
- Rehabilitation of 1 No Hall, Physics and Chemistry Laboratory, Obeagu Community Secondary School, Awgu LGA.
- Akann Ibiam International Airport in collaboration with South East NASSmembers.
- Mpu Spring water supply project. 2004/2006.
- Okpanku water supply project 2004/2006. Pontoon Raw water collection from IVO River, treatment, storage and pipeline.
- Nenwe – Nomeh – Nara – Mbunimbu Road. Spur To Obeagu Oduma.
- Ugwueme – Nenwenta – Ezere – Nkwe – Mgbidi – Mmaku. Awgunta – Obeagu Road.
- Funded for 2017: Ozalla – Obe – Agbani – Akpugo – Amagunze – Ihuokpara Road.
- Rehabilitation of Agbaogu – Ihe – Owelli – Nenwe – Mgbowo – Awgu – Abia border Old Port harcourt Road.
- Second Niger Bridge in collaboration with South East NASS Members.
PROJECTS FACILITATED 2011 – 2013
- Godi-Agbo Road Erosion Control Enugu South. Enugu State.
- Oyibo – Mmaku Erosion Control Awgu Lga, Enugu State.
- AgbadaAlaAchi Erosion Control Oji River Lga, Enugu State.
- Achi Girls, – Ujuri – Odukaburu – The Road Erosion Control, Oji River LGA.
- Independence Layout Erosion Control Site, Enugu State.
- Amoli Junction to Enyimba – Achi Erosion Control Site in Enugu State.
- Imezi Owa – Eke Arim Aguobu Owa Road Ezeagu LGA. Enugu State.
- Enugu West Oyeowa – Ekeagu – Obeleagu – Obioma Erosion Control Site, Ezeagu LGA, Enugu State.
POLICE FORMATION
- Completion of Police Quarters and post at Owelli Awgu, Enugu State Police Command.
UNN NSUKA
- Completion Of Pathology Laboratory, College of Medicine, Ituku Ozalla
- Completion of Students Multi-Activity Centre
- Rehabilitation & Upgrading of Central Sewage Treatment Plant
- Remodeling of Personnel Building
- Remodeling of Records & Advancement Office Building
- Solar Plants & Street Lighting UNN – Nsukka Campus.
- Solar Plants & Street Lighting at UNN – Enugu Ituku Campus
- Gully Erosion Control Site at University Secondary School/Umunkaka
- Ituku-Ozalla Erosion Control Site.
- Enugu Campus Gully Erosion Control site
- Erosion Control site at new entrance Road/UNN Business Park.
- Infrastructure at Republic Layout Enugu State
- Erosion Control at New GRA, Enugu State.
- Solar Street Lighting in Oji River – Achi – Mmaku – Awgu – Ndeabo – Mpu – Okpanku –Akaeze Federal Highway Section I.
- Solar Street Lighting in Oji River – Achi – Mmaku – Awgu – Ndeabo – Mpu Okpanku -Akaeze Federal Highway Section II
- Solar Street Lighting in Awgu – Ishiagu – Mpu – Obiozara – Federal Highway.
- Solar Street Lighting in Enugu – Ozalla, Ogbaku Awgu Okigwe Section of Enugu Port Harcourt Express way
- Solar Street Lighting in Enugu – 9th Mile – Umumba – Oji – Ugwuoba –Awka
- Solar Street Lighting in Enugu – Nsukka Section of Enugu Makurdi Highway
- Solar Street Lighting in Enugu – Ozalla, Agbogugu – The – Owelli -mugbo – Ogugu – Nenwe – Awgu Section of Old Enugu Port Harcourt Road.
- Solar Street Lighting in 9th Mile – Udi – Nachi – Oji River Ugwuoba Section of Old Enugu Onitsha Federal Highway.
- Electrification and Refurbishing of the Engineering Workshop Complex.
- Reverse Engineering in Internal Combustion Engines and Electric Motor.
SCH. OF DENTAL TECH. & THERPHY
- Completion of Sickbay
- Completion of Auditorium
UNTH ENUGU
- Construction of 1 No. Bungalow, Access Road, and Street Light for Nuclear Medicine.
- Construction of 1 No. 2 Storey Building for Cardio Thoracic Unit (Centre of Excellence)
- Completion of Equipping/Furnishing of Intensive Care Unit (ICU)
- Construction Of 3 No. 2 Storey Academic and Administrative Building for the Ten Schools Operated by the Capital
NATIONAL GALLERY OFARTS
- Rehabilitation and Renovation of four Block Offices, Exhibition hall, Workshop, Library etc, Ama Onabolu Gallery Lagos.
- Purchase of utility Vehicles (Trucks, Hillux, cars).
- 5 Completion of National Gallery of Art, Portrait Gallery, Exhibition halls, Offices, Workshop and Studios, Minna.
- Completion of National Gallery of Art, Workshop and studios, Port –Harcourt
- Nkwo-Inyi-Inyi Girls-Obune Erosion control Project, Oji River LGA, Enugu State.
- Orie Oduma-Obeagu-Erosion Control Project, Aninri LGA, Enugu State.
- Umumba-Ndiagu Road Erosion Control Project, Ezeagu LGA, Enugu State.
- Afor Oghe-Amokwo-Ndiagu Oghe Erosion Control Project Ezeagu LGA, Enugu State.
- Agbogugu-Ohumagu Erosion Control Project, Awgu LGA, Enugu State.
- Inyi-Akpugoeze Erosion Control Project, Oji River LGA, Enugu State.
- Ukpuno-Ugwuoba Erosion Control, Oji River LGA, Enugu State.
- Okpumodu-Enugummaku-Isimmama Erosion Control Project, Awgu, Enugu State.
- Ozom- Mgba gbuowa Erosion Control Project, Ezeagu LGA, Enugu State.
- Ezenaja-Amada-Oraukwu Water Project Idemili North LGA, Enugu State.
- Reticulation of Mgbagbuowa-Artisan Water Project, Ezeagu LGA, Enugu State.
- Umuibeji Erosion Control Project.
- Ekegbo-Ozuda-Umuegbosi Erosion Control Project Oji River LGA.
- Amofia-Agu-Ikedimkpa Erosion Control Project Udi LGA.
- Ogbodikwu-Amaekpe Erosion Control Project, Umuahia South LGA Abia State.
- Awene Olo-Mgbagbuowa Erosion Control Project Ezeagu LGA.
- Umunkwo, Umuorgi, Umuohiagu Umuorishangor-Okpala Electrification Project.
- Design and Construction Of New Divisional Police Station Building Ndeabor, Aninri LGA. To be awarded.
- Funded Construction of Akpasha Junction-obuoffia-Amodu Junction with spur to Umuatugbu Ona -Umueze Awkunanaw. Awarded.
- Design And Construction Of Nkwuni Mammu Bridge. To be awarded.
- Design and construction of Inyi-Akpugoeze -Anambra Boarder Road. To be awarded
- Design And Construction of Umulumgbe-Umuoka-Amokwu Ikedimkpa Egede-Ojieyi Awhum Road. To be Awarded.
- Enugu West Water for all programme, Water borehole drilling rig procured. Pilot Drilling of water boreholes to commence immediately procurement is concluded. Drilling of many boreholes to be provided in the 2018 budget.
RECORD OF IKEOHA FOUNDATION BURSARY AWARDEES 2004-2017
YEAR | LOCAL GOVERNMENT AREAS | TOTAL | |||||||
ANINRI | AWGU | EZEAGU | OJI
RIVER |
UDI | ENUGU
NORTH |
IGBOEZE
NORTH |
OTHERS | ||
2004 | 7 | 18 | 1 | 6 | 6 | 39 | |||
2005 | 53 | 6 | 1 | 5 | 6 | 48 | 119 | ||
2006 | 25 | 25 | 25 | 25 | 25 | 125 | |||
2007 | 40 | 40 | 40 | 40 | 40 | 200 | |||
2008 | 50 | 50 | 50 | 50 | 50 | 8 | 258 | ||
2009 | 50 | 50 | 50 | 50 | 50 | 3 | 21 | 274 | |
2010 | 50 | 50 | 50 | 50 | 50 | 4 | 16 | 270 | |
2011 | 50 | 50 | 50 | 50 | 50 | 7 | 25 | 282 | |
2012 | 50 | 50 | 50 | 50 | 50 | 10 | 25 | 285 | |
2013 | 83 | 83 | 83 | 83 | 83 | 20 | 60 | ||
2014 | 50 | 50 | 50 | 50 | 50 | 25 | 25 | 300 | |
2015 | 50 | 50 | 50 | 50 | 50 | 25 | 25 | 300 | |
2016 | 50 | 50 | 50 | 50 | 50 | 25 | 25 | 300 | |
2017 | 50 | 50 | 50 | 50 | 50 | 25 | 25 | 300 | |
TOTAL | 658 | 622 | 600 | 609 | 610 | 144 | 255 | 48 | 3547 |
RECORD OF SCHOLARSHIP RECIPIENTS 2013-2017
YEAR | LOCAL GOVERNMENT AREAS | TOTAL | |||||||
ANINRI | AWGU | EZEAGU | OJI
RIVER |
UDI | ENUGU
NORTH |
IGBOEZE
NORTH |
OTHERS | ||
2013 | 3 | 3 | 3 | 3 | 3 | 15 | |||
2014 | 3 | 3 | 3 | 3 | 3 | 2 | 2 | 19 | |
2015 | 3 | 3 | 3 | 3 | 3 | 1 | 16 | ||
2016 | 3 | 3 | 3 | 3 | 3 | 1 | 2 | 18 | |
TOTAL | 12 | 12 | 12 | 12 | 12 | 3 | 3 | 2 | 56 |
NO OF ADULT LEARNERS THAT HAVE RECEIVED FSLC
YEAR | ANINRI | AWGU | EZEAGU | OJI RIVER | UDI | TOTAL |
2012 | 84 | 28 | 57 | 46 | 7 | 222 |
2013 | 32 | 48 | 39 | 31 | 2 | 152 |
2014 | 90 | 37 | 17 | 11 | 16 | 171 |
2015 | 115 | 24 | 19 | 13 | 6 | 177 |
2016 | 108 | 22 | 37 | 30 | 197 | |
TOTAL | 429 | 137 | 154 | 138 | 61 | 919 |
OTHER ACHIEVEMENTS
- Over 12,000 women and youths have received basic education in our 36 Adult Literacy Centres
- Over 3, 547 students have completed their university education courtesy of our bursary scheme
- 56 undergraduate students are enjoying full university scholarship
- 15 schools, their quiz masters and deserving students have received different categories of awards including complete sets of science equipment, text and exercise books and financial assistance by participating in our annual secondary schools quiz competition
- 20,000 units of anti-malarial drugs distributed to malaria-endemic areas.
- 5,477 adult learners fitted with reading glasses
- 25 Community Volunteers trained on tubercle-vigilance
- Continuous awareness creation on HIV/Aids, TB, and Malaria
- 20 Co-operative societies supported with farming micro credit (to combat under-nutrition and expand livelihood options)
- 5,320 students have participated in our annual Under-18 Football Competition since 2009
- 4,250 women and youths (850 each from 5 LGAs) have been trained on modern agro farming
- Over 1000 beneficiaries have participated in our ICT Training Programme
- Over 6,000 widows have been supported with household equipment, agro inputs and financial assistance since 2007
- Engineering graduates have been supported to undergo training at the Science Equipment Development Institute, SEDI, Enugu.